RISK MANAGEMENT IN PRODUCTION SURFACE FACILITY


Training

Title : RISK MANAGEMENT IN PRODUCTION SURFACE FACILITY
Date : 02 Agustus 2017 - 04 Agustus 2017
Time : 08.00 - 16.00
Venue :
Price : Please Call us

Description

OBJECTIVES

This course is designed to provide participants with a complete overview of Oil and Gas Production and to provide a comprehensive understanding of risk Management until evaluation to handle in production surface facilities . It will be delivered in order to meet the needs of non-technical personnel, and go into detail of technical personnel’s daily in-field operation, safety and maintenance.

Technical and non-technical personnel, Engineer, Facility, HSE, Drilling, Maintenance engineers, supervisor, and  production operation staff who involved in the field and plant operation, Everybody who wants to take benefits from this course of Oil & Gas Company who involves in or concern with daily onshore & offshore oil & gas surface production facilities and those who responsible of the continuity and integrity of the surface production.

 

COURSE CONTENT

  • Overview of Oil and Gas Production.
  • Onshore and Offshore Facilities.
  • Wellheads, Manifolds and Gathering
  • Phase Separation and Oil Treating.
  • Gas Compression, Conditioning and Treating
  • Metering, Storage and Export.
  • Pipelines and Risers.
  • Produced Water Treating.
  • Filters, Scrubbers, Reboilers and Heat Exchangers.
  • Risk in Production Surface Facilities.
  • Risk Management Process Steps ; the Management Circle.
  • Risk Management Planning.
  • Risk Identification and Assessment.
  • Qualitative and Quantitative Risk Analysis
  • Risk Response Planning, Monitoring and Control.
  • Probability and Consequence of Failures.
  • Risk Level in API, ASME and DNV Codes and Standards.
  • PoF and CoF Calculation.
  • Preventive/Corrective Maintenance and Inspection Planning.
  • RBI Deliverable: Where, What, How and When to Inspect.
  • Case Study/ Examples: Application of the Method.
  • Definition of Surface Facilities System Studied.
  • Segmentation of Pipelines and Equipment.
  • Detail Information needed of all items.
  • Risk Assessment and Analysis Procedures.
  • Determination of Factors in Likelihood Category
  • Calculation of PoF and Likelihood Analysis.
  • Determination of Elements in Consequence Category.
  • Calculation of CoF and Consequence Analysis.
  • Presentation of Results.
  • Segment Risk Distribution Matrix.
  • Average Risk Distribution Matrix.
  • The Logic of High Risk Response Plan.
  • Response to Achieve Medium-High Level.
  • Response to Achieve Medium Level.
  • Corrective Action needed.
  • Financial Risk Evaluation.
  • Summary and Discussion

  

FACILITATOR AND CV

Ir. In Jumanda Kasdadi, MT / Dr. Ir. Viktor Malau, DEA


Venue

Venue :
City : Yogyakarta/Bandung/Jakarta
State : Yogyakarta/Bandung/Jakarta
Country : Indonesia