OVERVIEW
In the Oil and Gas Industries, one of the most important activities is to measure, to calculate, and to make a report of the final quantity and quality of crude oil, produced gas, remaining stock at the storage tank or floating storage. The quantity of crude oil and gas delivered for sales or transferred to the next handling entities have to meet the standard condition of legitimation and formal matters within interrelated companies.
To avoid big losses of crude oil and gas, remaining stock and sales poured forth should be done using a standard form after crude oil and gas have been separated and kept.
The course also explains about how to calculate entitlement based on PSC Contract and how to nominate and lift the entitlement from the Terminal, based on off take procedure.
COURSE OUTLINE
- Production, Operation, and Lifting
- Production, Stock, and Lifting Reporting System
- Standard Measurement and Calculation of Oil Production and Lifting with Static System Method
- Standard Measurement and Calculation of Oil Production and Lifting with Dynamic System Method
- Loss Analysis
- Off Take Procedure, Entitlement Calculation, and Over (Under) Lifting Monitor
INSTRUCTOR
SOLID CORPORATION TRAINER TEAM
FACILITIES
Facilities of course :
üCertificate,
üHand Out,
üQuality Training Kit ,
üQuality Training Material (Hardcopy And Softcopy)
üConvenient Training Facilities At Stars Hotel, Lunch & 2 X Coffee Breaks,
Souvenir